When is the next inspection due?
Lifts are inspected every 12 months (the first time 24 months after commissioning), cranes and hoists every 2 years or 1 year, pressure vessels and boilers every 4 years. Choose the equipment and the date of its last inspection for the exact date.
Choose the equipment and a date — the result appears here.
An estimate. The binding date is the one in the equipment's inspection log or last report. Inspections follow a written request — within 2 weeks for lifts and within 6 weeks for lifting and pressure equipment — so “Request by” is that far ahead of the due date. Intervals checked against the regulation texts on 14 September 2026.
An additional inspection is required outside these intervals — after reconstruction, repair of load-bearing parts, a shutdown of more than 6 months before a change of the person who maintains the lift, a lifting appliance out of use for more than 1 year or pressure equipment out of use for more than 12 months, or an accident.
The intervals at a glance
| Equipment | Periodic inspection | Request at the latest | Legal basis |
|---|---|---|---|
| Lift — first inspection | 2 years after commissioning | 2 weeks before the due date | Art. 24(1)(2) — Lifts Ordinance |
| Lift | 1 year | 2 weeks before the due date | Art. 24(1)(2) — Lifts Ordinance |
| Crane, trolley, hoist, excavator, work platform | 2 years; 1 year over 10 years from manufacture; test every 8 years | 6 weeks before the due date | Art. 108(1)(2)(a), (1)(3) and (8) — Lifting Equipment Ordinance |
| Suspended basket, hoist for people | 2 years; 1 year over 10 years from manufacture | 6 weeks before the due date | Art. 108(1)(2)(a) and (8) — Lifting Equipment Ordinance |
| Lifting attachment | 1 year | 6 weeks before the due date | Art. 108(1)(2)(b) and (8) — Lifting Equipment Ordinance |
| Pressure vessel, boiler | 4 years; test every 8 years | 6 weeks before the due date | Art. 265(1)(2)(a) and (1)(3) — Pressure Equipment Ordinance |
| Steam or hot-water piping | 1 year; test every 8 years | 6 weeks before the due date | Art. 265(1)(2)(c) and (1)(3) — Pressure Equipment Ordinance |
The intervals in the regulations
How often is a lift inspected?
The first periodic inspection is 24 months after the lift is put into service, then every 12 months (Art. 24(1), point 2). You can work out the exact date with our due-date calculator.
How often are cranes and hoists inspected?
The Ordinance sets these intervals for all users; ESTIMA KM carries out inspections within the scope of licence No. 485. Cranes, trolleys, electric hoists, excavators with a hook or grab, suspended baskets, mobile elevating work platforms, and hoists for people or for people and goods: within 2 years of the last inspection if up to 10 years old, within 1 year if older. Detachable lifting attachments: every 12 months. The deadline runs to the last day of the month (Art. 108(1), point 2, and (8)).
How often are boilers and pressure vessels inspected?
Pressure vessels, steam and hot-water boilers: once every 4 years. Steam and hot-water piping: once every 12 months (Art. 265(1)(2)). More: technical inspection of boilers and pressure vessels.