Which lifting equipment is under technical supervision?
The Ordinance on the Safe Operation and Technical Supervision of Lifting Equipment applies to (Art. 2(1)):
- cranes;
- electric trolleys on overhead runways and electric hoists not mounted on cranes;
- excavators designed to work with a hook, grab or electromagnet;
- detachable lifting attachments;
- suspended baskets for lifting people;
- mobile elevating work platforms;
- construction and other hoists for lifting people, or people and goods.
The runways of cranes, trolleys, electric hoists and work platforms are also covered (Art. 2(2)). The Ordinance does not apply, for example, to lifts, goods-only construction hoists, personnel hoists with a lifting height of up to 3 m, stairlifts, industrial trucks, winches and escalators (Art. 3).
Slings are not registered with the technical supervision bodies, but the user is responsible for their safe use and must watch for defects or missing markings (Art. 100(4)).
How often must a crane be inspected?
The intervals are set in Art. 108(1)(2) and (3). What matters is the type of equipment and its age from the date of manufacture.
| Equipment | Inspection | Interval | Legal basis |
|---|---|---|---|
| Cranes, trolleys, electric hoists, excavators, suspended baskets, work platforms, personnel hoists — up to 10 years old | Periodic | within 2 years of the last inspection | Art. 108(1)(2)(a) |
| The same — over 10 years old | Periodic | within 1 year of the last inspection | Art. 108(1)(2)(a) |
| Detachable lifting attachments that are not part of a crane, trolley, electric hoist or excavator | Periodic | 12 months after the last inspection | Art. 108(1)(2)(b) |
| Cranes, trolleys, electric hoists, excavators, work platforms | Periodic with static and dynamic tests | 8 years (96 months) | Art. 108(1)(3) and (8) |
The two-year and one-year intervals run from the last inspection of any kind under Art. 108(1)(1)–(8): initial, periodic, additional or at the user's request. The eight-year interval for the load test runs from the last initial inspection, the previous load-test inspection or an additional inspection under points 4–7 (Art. 108(1)(3)).
Work out the date with the inspection date calculator.
When does the deadline expire, and what if it is missed?
The deadlines expire on the last day of the 24th or 12th month, counted from the month of the previous inspection. The deadline for the load test expires on the last day of the 96th month (Art. 108(8)). For planning, the month of the previous inspection matters, not its exact date.
After each inspection the licensed body fixes a sticker near the manufacturer's plate, showing the registration numbers of the body and of the equipment, the inspection date and the year of the next periodic inspection (Art. 108(9)).
The user must not allow equipment to be operated if an inspection under Art. 108(1)(1)–(7) has not been carried out (Art. 55(15)). If a periodic inspection is overdue and no request has been filed, the licensed body must immediately inform the regional office of the Chief Directorate “Inspection for State Technical Supervision” (GD IDTN) (Art. 108(11)). GD IDTN may carry out an unannounced inspection (Art. 108(10)(2)) and order the equipment to be taken out of service (Art. 119(1)(3)).
When is an additional inspection required?
Besides the periodic inspections, the technical supervision body carries out inspections (Art. 108(1)(4)–(8)):
- after reconstruction;
- when the equipment has not been used for more than one year;
- after replacing or repairing load-bearing structures or elements, hoisting mechanisms, load hooks or pulley blocks — for cranes, trolleys, electric hoists, excavators, detachable attachments and work platforms;
- after replacing or repairing the hoisting machine, suspension ropes and their fixings, overspeed governor or safety gear — for personnel hoists;
- after dismantling and reinstallation at another workplace — for stationary or rail-mounted cranes, trolleys and electric hoists, and for stationary work platforms and personnel hoists;
- at the user's request.
Inspections under points 3–7 include static and dynamic tests (Art. 111(1)), with the exception in Art. 111(2) for reconstructed equipment whose declaration of conformity is less than 24 months old. More on the tests in Static and dynamic testing of lifting equipment.
When equipment is scrapped, dismantled or taken out of use for more than 6 months, the user must notify the body it is registered with within 10 days (Art. 106).
How is an inspection requested and how long does it take?
The user sends a written request to the technical supervision body the equipment is registered with (Art. 108(2)). The body carries out the inspection:
- within 2 weeks of the request — for initial inspections and inspections under points 4–7;
- within 6 weeks — for periodic inspections, load-test inspections and inspections at the user's request.
The user is told the date at least 5 days in advance (Art. 108(3)). The inspection takes place in the presence of the responsible person under Art. 55(1) and/or the maintenance company (Art. 108(7)).
A periodic inspection checks conformity with the registration documents and the installation requirements, and includes a visual examination and a functional test of the mechanisms, electrical equipment, protective devices and hydraulic system (Art. 111(1) with Art. 110(1)(2)–(4)). The result is entered in the equipment's logbook (ревизионна книга) as an inspection report stating whether the equipment is fit for use and when the next periodic inspection is due (Art. 116(1)).
ESTIMA KM Ltd is a technical supervision body holding DAMTN (State Agency for Metrology and Technical Surveillance) licence No. 485 for lifting equipment. You can request an inspection through technical supervision of lifting equipment or via ESTIMA KM offices. For what such a body may and may not do, see What is a technical supervision body.
Need an inspection of lifting equipment?
Call or write to us.
Sofia: +359 2 951 54 53 Lifting equipment Work out the dateSources
- Ordinance on the Safe Operation and Technical Supervision of Lifting Equipment — Art. 2, 3, 55, 100, 105, 106, 108, 110, 111, 116, 119
This article is for information and does not replace the text of the legal act.