Strength testing of pressure equipment in Bulgaria

Strength tests on pressure equipment are hydrostatic — with water at 5 °C to 60 °C or another inert liquid — and are part of the periodic inspection once every 8 years. With an approved risk-based inspection (RBI) schedule under EN 16991, the interval may be up to 12 years (Art. 265(1)(3) and Art. 275(1) of the Bulgarian Ordinance on pressure equipment).

In this article
  1. When is a strength test mandatory?
  2. When is the test skipped at the first inspection?
  3. Hydrostatic or pneumatic test?
  4. At what pressure and for how long?
  5. When is the test passed?

When is a strength test mandatory?

Under Art. 267(2)(4) of the Ordinance on the Design, Safe Operation and Technical Supervision of Pressure Equipment, the technical supervision body performs a strength test at:

  • the initial inspection;
  • the periodic inspection with strength test — once every 8 years for vessels, boilers and piping, or at least every 12 years under an RBI schedule (Art. 265(1)(3));
  • the inspection after reconstruction;
  • the inspection when the equipment has not been used for more than 12 months;
  • the inspection after replacing or repairing pressure-bearing parts.

At inspections requested by the user, unannounced inspections and inspections after relocation, the body may carry out some or all of the checks, including a test (Art. 267(3)). The deadline for the periodic strength-test inspection may be extended by up to 6 months on a justified written request from the user, agreed with the body (Art. 265(6) and (7)).

When is the test skipped at the first inspection?

At the initial inspection, and at the inspection after reconstruction, of equipment whose conformity has been assessed, no internal examination and no strength test are done if all of the following apply (Art. 268):

  1. the final assessment included a strength test of the fully assembled equipment no more than 12 months ago;
  2. the external examination finds no defects affecting safe operation;
  3. no dismountable joints have been opened and no repairs made since the final assessment.

Hydrostatic or pneumatic test?

The standard method is hydrostatic — water at 5 °C to 60 °C or another inert liquid. With another liquid, the minimum temperature must take account of the design minimum metal temperature, and the maximum must be at least 10% below the liquid's boiling point and no higher than 60 °C (Art. 275(1)).

A hydrostatic test of a vessel may be replaced by a pneumatic test with air or inert gas if the manufacturer's documentation provides for it, or if the vessel (Art. 275(2)):

  • is used in a process where even minimal amounts of liquid are not allowed;
  • stands on a foundation not designed for the weight of the vessel filled with liquid;
  • has internal insulation or non-removable internals that the liquid would damage;
  • contains packing that must not be removed and would be damaged by the liquid.

A pneumatic test requires the safety measures in Art. 184: a safety valve on the supply line, protective barriers, the shut-off valve, pressure gauge and people in protected positions, and leak-tightness checked only after the pressure has been lowered to working pressure.

At what pressure and for how long?

For equipment whose conformity has been assessed under the ordinances under Art. 7 of the Technical Requirements for Products Act (TRPA), the test pressure and duration are those in the manufacturer's documentation (Art. 275(4) and (5)). For equipment placed on the Bulgarian market before 14 March 2004, or not covered by an Art. 7 ordinance, the pressure is the one in the approved design documentation, or for imports in the manufacturer's documentation (Art. 275(3)). For such equipment the duration is at least:

Wall thickness of the thinnest tested elementMinimum duration
up to 20 mm5 minutes
up to 50 mm10 minutes
up to 100 mm20 minutes
over 100 mm30 minutes
cast vessels and multilayer vessels60 minutes

Legal basis: Art. 275(5).

When is the test passed?

The equipment has passed the test when none of the following is found (Art. 275(6)):

  • a difference between the pressure recorded at the start and at the end of the test;
  • cracks, ruptures or visible permanent deformation;
  • leakage of fluid through the base metal or the joints.

A hydrostatic test is also used instead of an internal examination of a vessel when internals, insulation, linings or packing prevent a full check at the periodic inspection (Art. 269(1)). Wall thickness and part of the longitudinal welds are then checked non-destructively first, and the results are evaluated by an accredited inspection body (Art. 269(3) and (4)).

ESTIMA KM Ltd carries out strength-test inspections as a technical supervision body holding licence No. 834 for pressure equipment. See technical supervision of pressure equipment, the intervals in Boiler and pressure vessel inspections, or reach us via ESTIMA KM offices.

Need an inspection of pressure equipment?

Call or write to us.

Sofia: +359 2 951 54 53 Pressure equipment Work out the date

Sources

This article is for information and does not replace the text of the legal act.

Frequently asked questions

How often is a boiler strength-tested?

Once every 8 years, or at least every 12 years under an approved risk-based inspection (RBI) schedule under EN 16991 (Art. 265(1)(3)(a)).

Is a new pressure vessel strength-tested at the initial inspection?

Not if the final assessment included a strength test of the assembled vessel no more than 12 months earlier, the external examination finds no defects, and it has not been opened or repaired since (Art. 268).

Can the test be done with air?

Yes, if the manufacturer provides for it, or if liquid is not allowed, the foundation is not designed for it, or it would damage insulation, internals or packing (Art. 275(2)). The safety measures in Art. 184 are mandatory.

Are plate heat exchangers hydraulically tested?

For compabloc, plate and spiral heat exchangers, air coolers and closed expansion vessels, inspections follow the manufacturer's instructions because hydraulic or pneumatic tests risk damaging them (Art. 269(6)).